Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 730 | 957 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 31 / 31 | |
| 720 | x | 14.20 | 1220.00 | 2440.00 | FM E1 | 4 / 4 | |
| 715 | X | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 5 / 5 | |
| 713 | x | 18.00 | 1220.00 | 2440.00 | FM E1 UTY E | 13 / 13 | |
| 708 | X | 8.60 | 1220.00 | 2440.00 | FA B4 G1 | 16 / 16 | |
| 707 | X | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 7 / 7 | |
| 706 | X | 20.50 | 915.00 | 1830.00 | MA B4 G1 | 1 / 1 | |
| 704 | X | 14.60 | 1220.00 | 2440.00 | MA B4 G1 | 11 / 11 | |
| 703 | X | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 33 / 33 | |
| 702 | X | 11.60 | 915.00 | 1830.00 | FA B4 G1 | 44 / 44 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 194 | 179 | 2026-09-03 | M:September / W:36 | 1 | Shift A | P1.CU.8 | 14.60 x 1220.00 x 2440.00 | MA B4 G1 | 27 | P:0 / B:27 | O:0 / B:27 | 0.040484 | 1.093081 | Del |
| 185 | 168 | 2026-09-02 | M:September / W:36 | 429 | Shift B | P1.CU.10 | 11.60 x 910.00 x 1820.00 | FA B4 G2 | 41 | P:0 / B:41 | O:0 / B:41 | 0.017556 | 0.719785 | Del |
| 180 | 163 | 2026-09-02 | M:September / W:36 | 811 | Shift B | P1.CU.9 | 9.00 x 1220.00 x 2440.00 | FA E2 UTY KRUING | 44 | P:1 / B:43 | O:0 / B:43 | 0.025005 | 1.100225 | Del |
| 178 | 161 | 2026-09-02 | M:September / W:36 | 331 | Shift B | P1.CU.9 | 9.00 x 1220.00 x 2440.00 | FA E2 BB CC | 80 | P:1 / B:79 | O:0 / B:79 | 0.023814 | 1.905152 | Del |
| 173 | 156 | 2026-09-02 | M:September / W:36 | 336 | Shift A | P1.CU.1 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003684 | 0.736758 | Del |
| 172 | 155 | 2026-09-02 | M:September / W:36 | 346 | Shift A | P1.CU.1 | 20.50 x 1220.00 x 2440.00 | MA B4 G1 | 31 | P:0 / B:31 | O:0 / B:31 | 0.058048 | 1.799476 | Del |
| 171 | 154 | 2026-09-02 | M:September / W:36 | 378 | Shift A | P1.CU.1 | 20.50 x 1220.00 x 2440.00 | MA B4 G1 | 30 | P:0 / B:30 | O:0 / B:30 | 0.058048 | 1.741428 | Del |
| 170 | 153 | 2026-09-02 | M:September / W:36 | 235 | Shift B | P1.CU.10 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:18 / B:182 | O:0 / B:182 | 0.003181 | 0.636291 | Del |
| 169 | 152 | 2026-09-02 | M:September / W:36 | 263/210 | Shift B | P1.CU.10 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 301 | P:7 / B:294 | O:0 / B:294 | 0.003181 | 0.957618 | Del |
| 168 | 151 | 2026-09-02 | M:September / W:36 | 263/x | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 176 | P:3 / B:173 | O:0 / B:173 | 0.003181 | 0.559936 | Del |