Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana
Penanganan Out PTS P1

Penanganan Out PTS P1 (Pengeluaran Stock Reject)

Tabel Referensi Stock Reject (detail_reject_p1) Klik Pilih untuk mengisi form
Aksi ID Tanggal No Pallet Ukuran (T x L x P) Grade Awal Out Sisa (Bal)
Pilih 170 2026-09-09 525 6.00x1220.00x2440.00 FA B4 BB CC 3 0 3 pcs
Pilih 169 2026-09-09 552 2.70x1220.00x2440.00 FA E2 CI D2 7 0 7 pcs
Pilih 168 2026-09-09 625 2.70x1220.00x2440.00 FA E2 CI D2 2 0 2 pcs
Pilih 167 2026-09-09 605 6.00x1220.00x2440.00 FA B4 BB CC 2 0 2 pcs
Pilih 166 2026-09-09 633 15.00x1220.00x2440.00 FA B4 BB CC 1 0 1 pcs
Pilih 165 2026-09-09 593 15.00x1220.00x2440.00 FA B4 CI 17 1 0 1 pcs
Pilih 164 2026-09-09 x 3.00x1220.00x2440.00 FA B4 BB CC 6 0 6 pcs
Pilih 163 2026-09-09 x 3.00x1220.00x2440.00 FA B4 BB CC 1 0 1 pcs
Pilih 162 2026-09-09 x 3.00x1220.00x2440.00 FA B4 BB CC 10 0 10 pcs
Pilih 161 2026-09-07 599 15.00x1220.00x2440.00 FA E2 BB CC 1 0 1 pcs
Form Out Stock Reject (data_out_pts_p1)
⚠️ Belum Ada Data Terpilih
Silakan klik tombol Pilih pada tabel di sebelah kiri untuk mengisikan detail ke form ini.
Riwayat Pengeluaran (data_out_pts_p1) (Keseluruhan Transaksi)
No ID Out ID Detail Reject Tanggal Out Jumlah Out Keterangan Out Waktu Input
Belum ada riwayat pengeluaran.